设备搬迁合同

[04-01 11:23:53]   来源:http://www.kuaixue5.com  运输合同   阅读:8164
概要: 概要:3. inspect and measure the temperature, humidity, and power supply (with ground connection properly made) in the new terminal to ensure that they are up to the requirements.4. secure all the entrance and exit permits and go through all the necessary procedures in advance to facilitate the move.5. designate a coordinator to work with the counterpart appointed by the carrier.6. provide the map and the layout of the new terminal for the carrier at least five days prior to the move.7. allo
设备搬迁合同,标签:公路运输合同,运输合同样本,http://www.kuaixue5.com
3. inspect and measure the temperature, humidity, and power supply (with ground connection properly made) in the new terminal to ensure that they are up to the requirements.
4. secure all the entrance and exit permits and go through all the necessary procedures in advance to facilitate the move.
5. designate a coordinator to work with the counterpart appointed by the carrier.
6. provide the map and the layout of the new terminal for the carrier at least five days prior to the move.
7. allocate a temporary storage room suitable for the equipment in transit both at origin and at destination.
[惠普(hp) 服务器,机柜搬迁细则]
一 乙方搬迁前准备: 
1.熟知甲方提供的运输线路;
2.安排好搬迁人员分工;
3.准备所有搬迁所需工具(如:十字,一字;t8,t9, t10,t15, t20,t30, t40;搬迁标签,纸箱,滑车,钳子,减震材料等) ,车辆及相关资料; 
4.经甲方同意提前三天到新机房熟悉甲方提供的设备摆放图;
moving instructions on hp server & cabinet
(a). the carrier shall make the following preparations beforehand:
1. be fully familiar with the transportation route or routes chosen by the shipper.
2. divide the workload among its employees. 
3. get ready the vehicles and relevant documents as well as all the tools needed, such as various types of screw-drivers, t8,t9, t10,t15, t20,t30, t40, color-coded labels, cartons, pulleys, wrenches, and shock-absorbing materials.
4.with the shipper's approval, inspect the new terminal and get familiar with its layout three days prior to the move.
二 服务器 ,机柜拆卸 
1.甲方与乙方同时检测服务器状态和服务器配置,检测完后双方在验机单上签字(《搬迁验机表》见附件a);
2.由甲方关闭所有搬迁设备软件程序;
3.由乙方工作人员断开电源 ;
4.拆卸前每位乙方工作人员佩戴防静电手环;
5.以甲方现在每个机柜为一套设备进行统一标识;
6.每台服务器对应的联线、硬盘、电源贴上对应标签;
7.断开服务器所有联线;
8.将服务器拆离机柜,如果拆离硬盘应做好标识;
9.对服务器进行包装,对拆离的硬盘做减震包装;
(b). disassembling hp server & cabinet
1. both the shipper and the carrier shall inspect and test the server and its accessories simultaneously and both parties shall sign on the inventory list (see attachment a) after the satisfactory inspection.
2. the shipper is to terminate all the software employed on the server.
3. the employee of the carrier is to turn off the power supply.
4. each employee of the carrier shall put on an antistatic bracelet before work.
5. the carrier shall now start to attach a color-coded label to the cabinet and its corresponding server in an organized way.
6. the cables, disks, and power supply of each server are marked with identical color-coded labels respectively.
7. the cables of the server are taken away.
8. the server is separated from the cabinet and its disks are properly labeled if taken out.
9. the server is securely packed and its isolated disks are wrapped in shock-absorbing materials.
10. the server together with its accessories is loaded in the vehicle.
[易安信( emc) 服务器,机柜搬迁细则]
一 乙方搬迁前准备: 
1.熟知甲方提供的运输线路;